
Ah now I understand you friend. Well let's say that from where I take the current comes a cable under a floor folder, it is a tpr but it comes with a pvc pipe, then it goes up inside a metal pipe, the old man of the lamppost. From there I have to connect and come with a PVC pipe and go up to the roof of the garage. Me. Client wants to install a led tube in the middle of the garage but pulling cable under lead, without bone insulation without pvc pipe or anything. The ceiling height is about 2.50 I think I have to measure it well. The same is crazy for me that, if it is not underground cable no
If it already comes under the floor with tpr it already comes badly
If you really want to work under standards, I congratulate you on your choice, unfortunately Argentina has very advanced standards but a society very reluctant to respect them, we see it daily, people on motorcycle without a helmet, in a car without a belt, people who cross an avenue through where it should not or does not respect the traffic lights, are basic things that do not cost money, imagine the electrical rules from which you must pay a significant difference of money,,
What you have to do with these people is to advise as best as possible and demand one the choice of the materials to be used, you give them the possible proposals and the budgets directly with included materials, it is the best way not to deal with customers who want to reduce costs where they should not since the professionals are us and who should choose what material to use is the professional since the client does not have the technical capacity to differentiate between the different materials