Hi
argfedex
That is a job that is done only once. I would put reinforced pipe and sintenax cable or similar three-pole. The pipe is thicker better, you never know if in the future you would have to reinforce the lines.
The descent of the company to the pillar is 1 "1/2.
A detail, as you still have to do the subfloor, would put a row of bricks on the pipe, to mark the area and protect it
Regards