⚡ Descuentos en cursos en video - Lleva tu aprendizaje técnico al siguiente nivel y aprovecha precios especiales antes de que termine la oferta. 🔥 Aprovechar oferta ahora 🔥
Household Electricity

Edesur Phase Change

comixzone
hace 5 años
hace 5 años
Hello Amigos de Yo Reparo, I will be as brief as possible, first of all I tell you that I am an Electrical Engineer from the Federal Capital ENET Year 1979, and unfortunately I also have a Psychiatric disability "SERIOUS DEPRESSION" about 6 years ago. (I can't work since then). The phase in which I was connected was cut 95% of the Times with respect to the other phase, so I went to Edesur to ask for the change, for days that I was without supply and the other neighbors had light (in the other phase ), they treated me very well and I presented a note with a copy of the Certificate of Disability which they signed me with a stamp of Received EDESUR SA and they put a sticker with a number and the date, also when seeing me so badly the boy who attended me asked by the PC the urgent change of phase as a handicapped client and in observations put "Urgently meet since the client was very nervous and depressed." (He gave me a copy of the report) He told me that in 2 hours the crew would go to my home. The hours passed and nobody came, called dozens of times and I got the claim numbers, sent SMS etc., until I called the central SAN JOSE, and they gave me the order number that the crew had, but nobody ever came, I went back to the afternoon and they told me "go now, we already sent him the gang", they never came. They took my hair, so the next morning I changed my phase (I know that is not legal, but it is not legal to abandon a person with my problems) now I am afraid they will come and make me mess when they see that I already change phase Please see what you think of the connection, my cable is the red one that was in phase 2 and now it is in Phase 1, so as not to disturb the neighbors use what was left of the screw and add a bronze washer and a nut So I connected it was very tight and the nut entered perfect still a little bit of screw, sorry but I never uploaded a photo to the forum I hope it appears [URL=http://img21.imagevenue.com/img.php?Image=963939809_CAMBIOFASE_122_236lo.jpg] [IMG] http://img21.imagevenue.com/loc236/th_963939809_CAMBIOFASE_122_236lo.jpg [/IMG] [/URL] Then I made some measurements, maybe silly and irrelevant ... just in case (I don't want anyone to suffer an accident because of me) and it gives me the following: PHASE AND FRAME OF THE DOOR: 214V Which is equal to what is between neutral and phase. (In my apartment he always gave me that measurement with the old phase) DOOR AND NEUTRAL FRAME 0,5V FRAMEWORK OF THE DOOR AND THE BOX IN WHICH MAKES THE CHANGE: 0,05V EDESUR OUTDOOR BOX AND DOOR FRAME: 0.6V (same just look there, don't touch anything) I really made those measurements that may have nothing to do but I wanted to make sure I had not done any trouble. Now I don't know what to do if I leave everything like this working or return to my phase (the one that always cuts) in case these guys come, which I doubt very much. I don't know what to do really and I'm having a hard time (very nervous), and I hope you can guide me. Many thanks!!!!
elektomaq
elektomaq
62.202
hace 5 años

What catches my attention is that a phase is missing.

Responder
comixzone
hace 5 años

elektomaq, if a phase is missing, but in the street box is, without, without the corresponding cap and you know the best ??? it's a beautiful phase, it even has the 220V nailed thing that the other two don't have, in the old one I was in there is always with all the fury 198V and in the new one I'm 214V, I really don't know why they didn't use it (to the third one that doesn't have the plug). Regards!!!

Responder
elektomaq
elektomaq
62.202
hace 5 años

And it should be used, at least to reduce consumption in the other two. Remember that the voltage drop is directly proportional to the consumption

Responder
comixzone
hace 5 años

Yes, but that should be done by the company (say hehe) ...

Responder
elektomaq
elektomaq
62.202
hace 5 años

Obviously

Responder
elektomaq
elektomaq
62.202
hace 5 años

Any modification, even the phase change, must be done by the company

Responder
Ennio Montenegro.
hace 5 años
hace 5 años
What you should have done is a claim for poor electrical service. You don't mention where the image box is. Apparently, it would not correspond to the change made by the company in charge of the supply. For the cables that did not respect the color code and caliber, it is not possible to analyze if the phase that has problems continues to feed another neighbor.
comixzone
hace 5 años

Thank you for your response, I comment that the box is inside the corridor of the departments type PH that is that Edesur can not access it without us opening the street door and yes, the phase I marked as No. 2 continues to feed To two other neighbors, before we fed the three of them, including myself, it is always the one that is cut, so I asked for the change. Although they never came.

Responder
servimat1
servimat1
138.835
hace 5 años
hace 5 años
Hi. Actually and while it is not entirely legal what you did you would not be stealing electricity under any circumstances. If they ever appear, check that they do not return you to the previous phase. Regards
comixzone
hace 5 años

Of course, it is before the meters, that is to say that my meter continues to run when I consume energy, as you say it is not completely legal, but I had no choice since I wanted to do it legally and it seemed that they were going to come but that so far did not happen and as they fixed the other phase, I do not think they come, if they do, you have to let me know to open the door and there I tell you about one that, they forced me to do it this way, if you think it is well done on change, do not touch anything and leave me in that phase, I will not allow them to change me, thank you very much for your response.

Responder
Ennio Montenegro.
hace 5 años

If they concur, they have to solve the problem of phase interruption.
Comment on the affected neighbors who must come together to enforce their rights and claim for repeated cuts.

Responder
comixzone
hace 5 años

Dear Ennio, thanks for your opinion, the phase that had no tension already has ... it took 48 hours to come to the corner box just to change a fuse ... of terror !!! It is the one that always cuts when it is hot in 95% of the cases so I stay in this other phase. Very kind of you to comment Best regards !!

Responder
Reparaciones similares solucionadas

¿Conoces una solución?

¡Aprende a reparar con estos cursos YoReparo!

4.6
(10)

Curso Localización de Fallas en Refrigeración en Heladeras/Neveras On/Off

Yamil Alarcón
$ 29 USD
$ 12 USD
4.71
(7)

Curso TV OLED y QLED con el Ing. Picerno

Ing. Alberto H. Picerno
$ 29 USD
$ 10 USD
4.64
(11)

Curso Electrónica para Reparación de Placas

Santiago Cediel
$ 29 USD
$ 11 USD
¿Tienes una mejor respuesta a este tema? ¿Quieres hacerle una pregunta a nuestra comunidad y sus expertos?
Regístrate gratis