Hello, if everything is at the limit of its caacity, you cannot have simultaneous loads above that capacity. If you have a 15kw transformer. You can't ask for 20kw. and of course the company will not give you a 15kw contract. with 15kw transformer. and air fuse of more than 15 kw. Therefore, the ipotetic of your query is not normal, because it is outside the proposed parameters.
The transformers also overheat and if they are required beyond their capacity, they can explode, and in addition the fuses are set to limit the loads to a maximum consumption and not above that consumption, the thermomagnetic protection act in the same way , with a little delay, but these in that case, do not affect the excess in the demand for current, the rush, greetings